Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 8 results ...

Carter, K and Fortune, C (2007) Sustainable development policy perceptions and practice in the UK social housing sector. Construction Management and Economics, 25(04), 399–408.

Chan, P W and Dainty, A R J (2007) Resolving the UK construction skills crisis: a critical perspective on the research and policy agenda. Construction Management and Economics, 25(04), 375–86.

Jha, K N and Misra, S (2007) Ranking and classification of construction coordination activities in Indian projects. Construction Management and Economics, 25(04), 409–21.

Kelly, J (2007) Making client values explicit in value management workshops. Construction Management and Economics, 25(04), 435–42.

Lam, K-C, Ning, X and Ng, T (2007) The application of the ant colony optimization algorithm to the construction site layout planning problem. Construction Management and Economics, 25(04), 359–74.

Lingard, H C, Yip, B, Rowlinson, S and Kvan, T (2007) The experience of burnout among future construction professionals: a cross-national study. Construction Management and Economics, 25(04), 345–57.

Olsen, J, Lee, Z-H and Pong, W (2007) Optimal selection of concrete anchors for connection cost reduction. Construction Management and Economics, 25(04), 423–34.

  • Type: Journal Article
  • Keywords: Structural design; optimization; cost; computer-aided design; civil engineering; anchorages
  • ISBN/ISSN: 0144-6193
  • URL: http://www.informaworld.com/openurl?genre=article&issn=0144%2d6193&issue=4&spage=423&volume=25
  • Abstract:
    A proprietary product such as a post-installed concrete anchor has a unique place in the engineering community that includes product design, manufacturing, testing, evaluation and design for expected service conditions. An economic model in a non-linear integer programming form is proposed for selection of concrete anchors in order to minimize connection cost. It is shown that the model can be easily incorporated with available computer software packages and generalized when different parameters and constraints are imposed to handle a variety of material selections. The information from recent testing conducted by CEL Consulting for a major engineering, procurement and construction (EPC) contractor is used to provide computational results. The method introduced here adds practical value to these types of industrial problems because it considers points of view from both structural engineers and project managers.

Oo, B-L, Drew, D S and Lo, H P (2007) Applying a random coefficients logistic model to contractors' decision to bid. Construction Management and Economics, 25(04), 387–98.